The World of Mobilaris

Case Studies

Circle dotted line

Trafikverket (Sweden)

Installations in the construction phase of the Förbifart Stockholm tunnel (50 km) below Stockholm

SAFETY

position people in real-time and in the case of an emergency evacuation, control and lead the evacuation process in an optimal way

Stockholm Vatten (Sweden)

Installation in their UG water systems

SAFETY

position people in real-time and in the case of an emergency evacuation, control and lead the evacuation process in an optimal way

Apatyt (Russia)

Installation in their UG mine in the Kirovsk region

SAFETY

position people in real-time and in the case of an emergency evacuation, control and lead the evacuation process in an optimal way

Barrick (USA and Canada)

Installations in three UG mines in US and one UG in Canada

EFFICIENCY

By the intuitive real-time 3D visualization of people, vehicles, machines and equipment, together with the knowledge of the shift-plan, the operation centre personnel can now take the right decisions faster than before and keep up the face utilization

LKAB (Sweden)

Installation in their Kirunavaara UG mine

EFFICIENCY

By the intuitive real-time 3D visualization of people, vehicles, machines and equipment, the operation centre personnel can now take the right decisions faster than before and keep up the face utilization

BOLIDEN (Sweden and Ireland)

Installations in all mines (UG and OP) and in one Concentrator Plant

SAFETY

position people in real-time and in the case of an emergency evacuation, control and lead the evacuation process in an optimal way

EFFICIENCY

By the intuitive real-time 3D visualization of people, vehicles, machines and equipment, together with the knowledge of the shift-plan, the operation centre personnel can now take the right decisions faster than before and keep up the face utilization

EFFICIENCY

Reducing energy cost for ventilation by 50% using Ventilation on Demand